CEC Reinstates Calico Project, but Hurdles Loom

The California Energy Commission (CEC) reinstated its approval of Tessera Solar LLC's Calico Solar power project, but California Unions for Reliable Energy (CURE) and the Sierra Club are still considering litigation to stop Tessera Solar LLC from building on pristine desert habitat.  Tessera Solar LLC proposed building its Calico Solar project on over 7.2 square miles of public land that is home to a high density of desert tortoises, a rare desert wildflower, and serves as a wildlife corridor for threatened bighorn sheep.  If the project moves forward, Tessera Solar LLC would bulldoze the land and install over 26,000 giant "SunCatchers."

Tessera Solar LLC's other project in California is also facing a hurdle due to poor site selection.  The company is proposing to build the Imperial Solar project on over 9 square miles of public.  The Quechan Tribe filed a lawsuit against the Department of the Interior for allowing the project to be built on public land without conducting a thorough review of culturally significant landmarks on the site.   The Imperial Solar site is also home to threatened flat-tailed horned lizards.

Comments

Popular posts from this blog

How Many Plants Species in the Desert?

Mowing Vegetation as Mitigation: Trump Administration Practice Goes Unchallenged

Ivanpah Wildlife, Visual Resources and Botany Hearings Completed