Ridgecrest Site Still Targeted by Solar Millennium

According to information obtained by Basin and Range Watch, the German energy firm Solar Millennium LLC and its US front company, "Solar Trust of America," are proposing a reconfigured facility for the Ridgecrest Solar power project.  The new site would use all photovoltaic panels, instead of thermal solar technology.  Check out the Basin and Range Watch update here.

The facility was opposed by the California Energy Commission (CEC) staff last year because the site chosen by Solar Millennium would cut off a Mohave ground squirrel corridor and destroy a robust desert tortoise population.   The company's board is currently being investigated for misappropriation of funds and embezzlement in Germany, but the US government is moving forward and issuing the company over 2.1 billion dollars in taxpayer-backed loans and 18 million dollars in grants for the Blythe solar power project.

a desert calico flower blooms on the site of the proposed Ridgecrest Solar power project.

Comments

Popular posts from this blog

How Many Plants Species in the Desert?

Mowing Vegetation as Mitigation: Trump Administration Practice Goes Unchallenged

Ivanpah Wildlife, Visual Resources and Botany Hearings Completed