Interior Approval Threatens Mojave Wildlife
Interior this month signed the Record of Decision formally approving the Soda Mountain Solar project, despite landscape-level planning that identified this area as a significant opportunity to connect otherwise isolated bighorn sheep populations. If Bechtel finds a utility company willing to purchase power from the 287 MW project, it will bulldoze nearly 4 square miles of intact desert next to the Mojave National Preserve to install photovoltaic panels that can just as easily be installed on rooftops or on already disturbed lands (more than 400 MW of rooftop solar capacity was installed in the first three months of 2015 , alone). These bighorn sheep are part of a large herd that inhabit the Soda Mountains. Their water source and foraging habitat would be jeopardized by the Soda Mountain Solar project if it is built, and an opportunity to connect this herd with the historical range of the bighorn sheep may be threatened by construction of the project. Interior delayed issuing t